Sela Pass and the Sela Tunnel

📍 Near Sela Pass at 13,700 ft / about 4,170 m; the tunnel at 27.5073, 92.0827, about 3,000 m, Tawang

🗓️ Outside the best season — Tawang is best visited Mar–May, Sep–Oct, not necessarily right now

NATUREMountain Pass✓ Cross-checked
🧭 Get directions📍 View on Google Maps
📷 See traveler photos of Sela Pass and the Sela Tunnel →

Story

AI-drafted from public sources — may contain mistakes, especially specific dates, names, or claims. Only "Good to know" above is field-checked.

Historians say

The only road route to Tawang. The Sela Tunnel opened 9 March 2024 - 12.04 km on NH-13, two lanes, operator NHIDCL, work begun 15 October 2020. Wikipedia describes it as ensuring all-weather connectivity between Guwahati and Tawang and as the longest bi-lane tunnel in the world at 13,000 feet.

Where to go next

No curated connections for this place yet — the connection graph (Technical doc §9) is seeded for a handful of flagship entities so far.

You might also like

More in Tawang, same category — not a nationwide match like the circuits above.